Date |
Agency |
Type |
Description |
Parts Affected |
| PHMSA | Notice | Request for Special Permit; Texas Gas Transmission, LLC (TGT) | Part 192 | |
| PHMSA | Final Rule | Clarification of Accident Reporting Requirements for Hazardous Liquid and Carbon Dioxide Pipeline Facilities | Part 195 | |
|
||||
| PHMSA | Final Rule | Clarification of Incident Reporting Requirements for Gas Pipeline Facilities | Part 191 | |
|
||||
| PHMSA | Direct Final Rule | Clarifying Hazardous Liquid Pipeline Integrity Management Guidance | Part 195 | |
|
||||
| PHMSA | Final Rule | Consent Orders | Part 190 | |
|
||||
| PHMSA | Final Rule | Declaratory Order Procedures | Part 190 | |
|
||||
| PHMSA | Final Rule | Editorial Correction to Requirements for Low-Stress Hazardous Liquid Pipelines in Rural Areas | Part 195 | |
|
||||
| PHMSA | Final Rule | Editorial Corrections and Clarifications to Criteria for Conducting Integrity Assessments Using Guided Wave Ultrasonic Testing | Part 192 | |
|
||||
| PHMSA | Final Rule | Editorial Corrections to Telephone and Facsimile Numbers | Part 190, 192, 193, 195 | |
|
||||
| PHMSA | Direct Final Rule | Electronic Retention of Part 194 Response Plans | Part 194 | |
|
||||
| PHMSA | Final Rule | Electronic Submission of Requests for Written Interpretations and Special Permits | Part 190 | |
|
||||
| PHMSA | Final Rule | Interpretation Request Procedures | Part 190 | |
|
||||
| PHMSA | Final Rule; Technical Amendment | Outer Continental Shelf Pipelines | Part 195 | |
|
||||
| PHMSA | Final Rule | Removing Obsolete Provision From Safety-Related Condition Reporting Requirements for Hazardous Liquid and Carbon Dioxide Pipeline Facilities | Part 195 | |
|
||||
| PHMSA | Final Rule | Removing Obsolete Provision in Safety-Related Condition Reporting Requirements | Part 191 | |
|
||||
| PHMSA | Final Rule; Correcting Amendment | Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments; Correction | Part 192 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-ASME B31.4 | Part 195 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-ASTM A333/A333M | Part 192, 195 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-ASTM A372/A372M | Part 192 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-ASTM A53/A53M | Part 192, 195 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-ASTM D2513 | Part 192 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-ASTM D2564 | Part 192 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-ASTM F1055 | Part 192 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-ASTM F1973 | Part 192 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-ASTM F2620 | Part 192 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-ASTM F2767 | Part 192 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-MSS SP-75 | Part 195 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-NACE SP0206 | Part 192 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-NACE SP0502 | Part 192, 195 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-NFPA 58 | Part 192 | |
|
||||
| PHMSA | Direct Final Rule | Standards Update-NFPA 59 | Part 192 | |
|
||||
| PHMSA | NPRM | Adjust Annual Report Deadlines | Part 191 | |
|
||||
| PHMSA | NPRM | Adjustment to OPID Notifications for Construction | Part 191, 195 | |
|
||||
| PHMSA | NPRM | Eliminating Limitations on Welders and Welding Operators | Part 192 | |
|
||||
| PHMSA | NPRM | Hazardous Liquid Valve Maintenance Schedule | Part 195 | |
|
||||
| PHMSA | NPRM | Integration of Innovative Remote Sensing Technologies for Right-of-Way Patrols on Gas and Hazardous Liquid Pipelines | Part 192, 195 | |
|
||||
| PHMSA | NPRM | Property Damage Definition for Reporting Incidents on Gas Pipelines and Accidents on Hazardous Liquid and Carbon Dioxide Pipelines | Part 191, 195 | |
|
||||
| PHMSA | NPRM | Remote Monitoring of Hazardous Liquid Pipeline Rectifiers | Part 195 | |
|
||||
| PHMSA | NPRM | Removing Unnecessary Provision for Material Properties Verification During MAOP Reconfirmation | Part 192 | |
|
||||
| PHMSA | NPRM | Timeframe To Make RMVs Operational | Part 192, 195 |