Pipeline Safety Updates:
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 | 2014
Date |
Agency |
Type |
Description |
Parts Affected |
Apr 12 | PHMSA |
CAO |
USDOT Issues Corrective Action Order for Keystone Pipeline Spill |
Part 195 |
PHMSA |
Forms |
New Versions to PHMSA Forms |
||
Jan 22 | PHMSA |
Notice |
Withdrawal of LDAR and CO2 Rules |
|
|
|
|
|
|
Jan 15 | PHMSA |
Notice |
USDOT Proposes New Rule to Strengthen Safety Requirements for Carbon Dioxide Pipelines |
Date |
Agency |
Type |
Description |
Parts Affected |
Dec 30 | PHMSA |
Notice |
Information Collection Activities; Notice and Request for Comments |
|
|
|
|
|
|
Nov 18 | PHMSA |
Notice |
Identification and Evaluation of Potential Hard Spots-In-Line Inspection Tools and Analysis |
|
Oct 12 | PHMSA |
Notice |
Information Collection Activities; Notice and Request for Comments |
|
|
|
|
|
|
Jun 21 | PHMSA |
Notice |
Notice of Limited Enforcement Discretion Regarding the Final Rule Titled "Pipeline Safety: Periodic Updates of Regulatory References to Technical Standards and Miscellaneous Amendments" |
|
May 6 | PHMSA |
Notice |
Mitigation of Ruptures on Onshore Gas Transmission and Gathering, Hazardous Liquid, and Carbon Dioxide Pipeline Segments Using Rupture-Mitigation Valves or Alternative Equivalent Technologies and Blending of Hydrogen Gas and Natural Gas within Gas Pipelines; Extension of comment period |
|
Apr 29 | PHMSA |
Final Rule |
Periodic Updates of Regulatory References to Technical Standards and Miscellaneous Amendments |
|
Mar 22 | PHMSA |
Notice |
Information Collection Activities |
|
Mar 5 | PHMSA |
Notice |
PHMSA Pipeline Annual Report Changes for Calendar Year 2024 (reports submitted in 2025) |
Part 195 |
|
|
|
|
|
Jan 10 | PHMSA |
Forms |
New Versions to PHMSA Forms |
|
PHMSA |
Forms |
New Versions to PHMSA Forms |
Date |
Agency |
Type |
Description |
Parts Affected |
Aug 2 | PHMSA | Notice | HL Integrity Assurance Notifications | Part 195 |
Aug 2 | PHMSA | Notice | GT Integrity Assurance Notifications | |
Aug 1 | PHMSA |
Correction |
Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Technical Corrections |
|
Jun 26 | PHMSA | FAQ | Public Awareness Program | Part 192, 195 |
Jun 13 | PHMSA | Forms | New Versions to PHMSA Forms | Part 195 |
May 19 | PHMSA | Notice | Decision from US Court of Appeals for the District Court of Columbia Circuit Re: GPA Midstream Association and American Petroleum Institute vs. PHMSA. Decided May 16, 2023 | |
Apr 27
|
PHMSA | Interp | Company Name: Integrity Plus - "Application of certain exceptions under §195.1(b) to your pipeline facility" (WinDOT Subscribers: See this interpretation in WinDOT by navigating to 195.1 and clicking on April 17, 23 in the interpretations at the top of this code section.) | Part 195
|
Apr 20 | PHMSA | Notice | Notice of public meeting and webcast | Part 195 |
Date |
Agency |
Type |
Description |
Parts Affected |
Nov 23 | PHMSA | FAQ | Temporary Repair and Permanent Repair FAQs | Part 192, 195 |
Oct 31 | PHMSA | Notice | Information Collection Activities: Notice and request for comments | Part 191, 195 |
Oct 25 | PHMSA | Notice | Limited Enforcement Discretion | Part 195 |
Aug 31 | CSB | Notice | Chemical Safety Board releases guidance for 40 CFR Part 1604, Reporting of Accidental Releases | Part 192, 195 |
Aug 29 | PHMSA | NPRM | Periodic Standards Update II | Part 191, 192, 195 |
|
||||
Aug 15 | PHMSA | Notice | National Pipeline Mapping System Information Collection Request for Comments | |
Jun 2 | PHMSA | ADB | Potential for Damage to Pipeline Facilities Caused by Earth Movement and Other Geological Hazards | Part 192, 195 |
May 26 | DOT | Notice | PHMSA Announces New Safety Measures to Protect Americans From Carbon Dioxide Pipeline Failures After Satartia, MS Leak | Part 192, 195 |
Apr 14 | PHMSA | FAQ | PHMSA Notice of Enforcement Discretion Regarding Interim Final Rule for Pipeline Safety: Unusually Sensitive Areas for the Great Lakes, Coastal Beaches, and Certain Coastal Waters | Part 195 |
Apr 8 | PHMSA | Final Rule | Requirement of Valve Installation and Minimum Rupture Detection Standards | Part 192, 195 |
Mar 31 | PHMSA | Final Rule | Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards. | Part 192, 195 |
Mar 11 | PHMSA | Notice | Information Collection Activities, notice and request for comments | Part 191, 195 |
Feb 2 | PHMSA | Notice | Plan to review and process Pipeline Safety Enhancement Program requests from pipeline owners and operators | Parts 190, 192, 195 |
Jan 28 | PHMSA | FAQ | Frequently Asked Questions (FAQs): Operator Qualifications | Parts 192, 195 |
Date |
Agency |
Type |
Description |
Parts Affected |
Dec 27 | PHMSA, DOT | Interim Final Rule | Unusually Sensitive Areas for the Great Lakes, Coastal Beaches, and Certain Coastal Waters | Part 195 |
Dec 21 | DOT | OMB Review of Final Rule | Pipeline Safety: Amendments to Parts 192 and 195 to require Valve installation and Minimum Rupture Detection Standards. | Part 192, 195 |
Dec 21 | PHMSA, DOT | Notice | Random Drug Testing Rate; Management Information System Reporting; and Obtaining Drug and Alcohol Management Information System Sign-In Information | Part 191, 195, 199 |
Dec 16 | DOT | Notice of Interim Final Rule | Unusually Sensitive Areas for the Great Lakes, Coastal Beaches, and Certain Coastal Waters. | Part 195 |
July 8 | PHMSA | Notice | Frequently Asked Questions on 911 Notifications Following Possible Pipeline Ruptures | Parts 192, 195 |
June 10 | PHMSA | Notice | Advisory Bulletin: ADB-2021-01 Issuance of advisory bulletin: Statutory Mandate to Update Inspection and Maintenance Plans to Address Eliminating Hazardous Leaks and Minimizing Releases of Natural Gas from Pipeline Facilities. | Part 192, 193, 195 |
June 7 | PHMSA | Press Release | Issuance of advisory bulletin: Statutory Mandate to Update Inspection and Maintenance Plans to Address Eliminating Hazardous Leaks and Minimizing Releases of Natural Gas from Pipeline Facilities. | Part 192, 193, 195 |
May 29 | TSA | Notice | Security Directive for Enhancing Pipeline Cybersecurity | Part 192, 193, 195 |
May 29 | TSA | Update | Updated Pipeline Security Guidelines | Part 192, 193, 195 |
May 26 | PHMSA | Notice | Termination of COVID Stay of Enforcement Discretion, Effective May 26, 2021 | Part 192, 193, 195, 199 |
May 25 | PHMSA | Notice | Notice and request for comments | Part 192, 195, 199 |
May 25 | PHMSA | Notice | Notice of a request for special permit by Buckeye Partners, LP | Part 195 |
Feb 16 | PHMSA |
Notice |
Information Collection Activities, notice and request for comments |
Part 192, 195, 40, 199 |
|
|
|
|
|
PHMSA |
Notice | Pipeline Safety: Periodic Updates of Regulatory References
to |
||
PHMSA |
Notice |
Operator Qualification Frequently Asked Questions |
||
Dec 28 | PHMSA | Notice | Information Collection Activities | Part 191, 192, 195 |
Dec 24 | PHMSA | FAQ | Frequently Asked Questions (FAQs) for the Pipeline Safety: Safety of Hazardous Liquid Pipelines Final Rule | Part 195 |
Dec 16 | PHMSA | Proposed Rule | Midstream Facilities Frequently Asked Questions | Part 192, 195 |
Nov 5 | PHMSA | Notice | Midstream Facilities Frequently Asked Questions | Part 192, 195 |
Jul 1 | ViaData | Final Rule | MEGA rule updates effective July 1, 2020
(Safety of Hazardous Liquid Pipelines) |
Part 191, 192, 195 |
Jun 22 | PHMSA | Notice | Meeting of the Gas and Liquid Pipeline Safety Advisory Committees | Part 192, 195 |
Apr 16 | PHMSA | Proposed Rules | Pipeline Safety: Regulatory Reform for Hazardous Liquid Pipelines |
Part 190, 194, 195 |
PHMSA |
Notice |
Information Collection Activities, Revisions to Hazardous Liquid Accident Report |
Part 195 |
|
|
|
|
|
|
PHMSA |
FAQ |
Draft FAQs for Gas and Hazardous Liquid Rules |
Part 192, 195 |
|
PHMSA |
Proposed Rules |
Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards |
Part 192 and 195 |
|
PHMSA |
Rule |
Public Meeting on Implementing the Recently Published Gas Transmission and Hazardous Liquid Final Rules |
Part 191, 192, 195 |
|
2020
Date |
Agency |
Type |
Description |
Parts Affected |
Dec 28 | PHMSA | Notice | Information Collection Activities | Parts 191, 192, 195 |
Dec 24 | PHMSA | FAQ | Frequently Asked Questions (FAQs) for the Pipeline Safety: Safety of Hazardous Liquid Pipelines Final Rule | Part 195 |
Dec 16 | PHMSA | Proposed Rule | Midstream Facilities Frequently Asked Questions | Parts 192, 195 |
Nov 5 | PHMSA | Notice | Midstream Facilities Frequently Asked Questions | Parts 192, 195 |
Jul 1 | ViaData | Final Rule | MEGA rule updates effective July 1, 2020
(Safety of Hazardous Liquid Pipelines) |
Parts 191, 192, 195 |
Jun 22 | PHMSA | Notice | Meeting of the Gas and Liquid Pipeline Safety Advisory Committees | Parts 192, 195 |
Apr 16 | PHMSA | Proposed Rules | Pipeline Safety: Regulatory Reform for Hazardous Liquid Pipelines |
Parts 190, 194, 195 |
PHMSA |
Notice |
Information Collection Activities, Revisions to Hazardous Liquid Accident Report |
Part 195 |
|
|
|
|
|
|
PHMSA |
FAQ |
Draft FAQs for Gas and Hazardous Liquid Rules |
Parts 192, 195 |
|
PHMSA |
Proposed Rules |
Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards |
Parts 192 and 195 |
|
PHMSA |
Rule |
Public Meeting on Implementing the Recently Published Gas Transmission and Hazardous Liquid Final Rules |
Parts 191, 192, 195 |
|
Date |
Agency |
Type |
Description |
Parts Affected |
PHMSA |
Notice |
Meeting of the Gas Pipeline Advisory Committee and Liquid Pipeline Advisory Committee |
Parts 192, 195 |
|
PHMSA |
Final Rule |
Safety of Hazardous Liquid Pipelines |
Part 195 |
|
|
|
|
|
|
PHMSA |
Notice |
Request for Special Permit Colonial Pipeline Company |
||
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: Public Meeting on Unusually Sensitive Area Definitions and Pipeline Awareness and Engagement |
Part 195 |
|
PHMSA |
Notice, ADB |
Potential for Damage to Pipeline Facilities Caused by Earth Movement and Other Geological Hazards |
Parfts 192, 195 |
|
PHMSA |
Notice |
Stay of Enforcement on API 5L |
Parts 192, 195 |
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities, Gas and Liquid Pipeline Safety Program Certification |
Parts 192, 194, 195 |
|
|
|
|
|
|
PHMSA |
Notice |
Information Collection Activities--Request for Extension of Existing Information Collections |
Parts 192, 193, 195 |
|
PHMSA |
Notice |
Information Collection Activities |
Parts 192, 194, 195 |
Date |
Agency |
Type |
Description |
Parts Affected |
PHMSA |
Notice |
Information Collection Activities; Revision of the Hazardous Liquid Annual Report |
Part 195 |
|
PHMSA |
Notice |
Request for Special Permit; Hilcorp Alaska, LLC |
Part 195 |
|
PHMSA |
Notice |
Gas and Hazardous Liquid Pipeline Risk Models, request for comments; extension of comment period. |
Parts 192, 195 |
|
PHMSA |
Notice |
Pipeline Safety: Gas and Hazardous Liquid Pipeline Risk Models |
Parts 192, 195 |
|
PHMSA |
Notice |
Information Collection Activities, Revision of the Hazardous Liquid Annual Report |
Part 195 |
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities |
Parts 192, 193, 195 |
|
PHMSA |
Notice |
Request for Special Permit--Hawaiian Electric Company, Inc. |
Part 195 |
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities |
Parts 192, 195 |
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities |
Parts 192, 193, 195 |
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities |
Parts 192, 195 |
|
PHMSA |
Update |
PHMSA Updates Liquid Gathering Line Jurisdictional Drawing |
Part 195 |
|
PHMSA |
FAQ |
Farm Tap FAQs |
Part 192 |
|
PHMSA |
FAQ |
Control Room Management FAQs |
Parts 192, 195 |
|
Date |
Agency |
Type |
Description |
Parts Affected |
PHMSA |
Notice |
Pipeline Safety: Meetings of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee |
Parts 191, 192, 195 |
|
PHMSA |
Notice |
Public meeting to discuss applicable definitions and available geospatial information system (GIS) data sources for marine coastal waters, coastal beaches and the Great Lakes, pertaining to Coastal Ecological Unusually Sensitive Areas (USA). |
Part 195 |
|
PHMSA |
Notice |
Meetings of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee |
Parts 192, 195 |
|
PHMSA |
Notice |
Requests for Special Permit, Notice and extension of comment period |
Parts 192, 195 |
|
Notice |
PHMSA |
Request for Special Permit; City of Bangor, Maine |
Part 195 |
|
PHMSA |
FR |
Operator Qualification, Cost Recovery, Accident and Incident Notification, and Other Pipeline Safety Changes |
Parts 190, 191,192, 195, 199 |
|
PHMSA |
FR |
PHMSA Releases Hazardous Liquid Final Rule |
Part 195 |
|
Date |
Agency |
Type |
Description |
Parts Affected |
PHMSA |
Notice |
Information Collection Activities |
Parts 191, 193, 195 |
|
PHMSA |
ADB |
Safeguarding and Securing Pipelines From Unauthorized Access |
Parts 192, 195 |
|
PHMSA |
Notice |
Special Permit Requests |
Parts 192, 193, 195 |
|
Aug 31 | PHMSA |
Notice |
Hazardous Liquid Integrity Management (HL IM) |
Part 195 |
PHMSA |
ADB |
Clarification of Terms Relating to Pipeline Operational Status |
Parts 192, 195 |
|
PHMSA |
Notice |
Information collection notice: Integrity Management in High Consequence Areas for Operators of Hazardous Liquid Pipelines |
Part 195 |
|
PHMSA |
Notice |
Pipeline Safety: Request for Revision of a Previously Approved Information Information Collection: National Pipeline Mapping System Program |
Parts 191, 195 |
|
PHMSA |
ADB |
Advisory Bulletin (ADB-2016-04): Ineffective Protection, Detection, and Mitigation of Corrosion Resulting From Insulated Coatings on Buried Pipelines |
Parts 192, 195 |
|
PHMSA |
Notice |
Public Workshop on Public Awareness |
Parts 192, 195. |
|
PHMSA |
Notice |
Pipeline Safety: Meeting of the Gas Pipeline Safety Advisory Committee and the Liquid Pipeline Safety Advisory Committee |
Parts 192, 195. |
|
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: Request for Special Permit |
Part 195 |
|
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities |
Part 195 |
|
PHMSA |
ADB |
Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding, River Scour, and River Channel Migration |
Parts 192, 194, 195. |
|
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities |
Parts 192, 195. |
|
|
|
|
|
|
PHMSA |
Notice |
Notice of Liquid Pipeline Advisory Committee meeting. |
Part 195 |
Date |
Agency |
Type |
Description |
Parts Affected |
PHMSA |
Notice |
Request for Special Permit |
Part 195 |
|
PHMSA |
Notice |
National Pipeline Mapping System; Extension of Comment Period and Notice of Operator Workshop |
Part 192, 195 |
|
PHMSA |
NPRM |
Safety of Hazardous Liquid Pipelines |
Part 195 |
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities |
Parts 192, 195 |
|
PHMSA |
Notice |
Pipeline Safety: Request for Revision of a Previously Approved Information Collection: National Pipeline Mapping System Program (OMB Control No. 2137-0596) |
Parts 192, 195. |
|
PHMSA |
Notice |
Pipeline Safety: Public Workshop on Hazardous Liquid Integrity Verification Process |
Part 195 |
|
PHMSA |
Notice |
PHMSA Pipeline Risk Modeling Methodologies Public Workshop |
Parts 192, 195. |
|
PHMSA |
Correction |
Periodic Updates of Regulatory References to Technical Standards and Miscellaneous Amendments; Corrections |
Parts 192, 193, 195. |
|
|
|
|
|
|
PHMSA |
Petition |
Miscellaneous Changes to Pipeline Safety Regulations; Administrative Significance: Petitions for Reconsideration |
Parts 191, 192, 195 |
|
|
|
|
|
|
PHMSA |
NPRM |
Operator Qualification, Cost Recovery, Accident and Incident Notification, and Other Pipeline Safety Proposed Changes; Proposed Rule |
Parts 190, 191, 192, 195, 199 |
|
|
|
|
|
|
PHMSA |
Notice |
PHMSA releases NPRM for Operator Qualification, Accident Notification. |
Parts 190, 191, 192, 195. |
|
|
|
|
|
|
PHMSA |
Notice |
Call for abstracts; preliminary notice of public workshop. |
Parts 192, 195. |
|
|
|
|
|
|
PHMSA |
Notice |
Information Collection Activities, Renewal of Annual Report for Hazardous Liquid Pipeline Systems |
Part 195 |
|
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities: PHMSA F 7000-1 Accident Report--Hazardous Liquid Pipeline Systems. |
Part 195 |
|
PHMSA |
Notice |
Pipeline Safety: Public Workshop on Pipeline Safety Management Systems |
All |
|
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities: PHMSA F 7000-1 Accident Report--Hazardous Liquid Pipeline Systems. |
Part 195 |
|
|
|
|
|
|
PHMSA |
|
Pipeline Safety: Information Collection Activities |
Parts, 192, 195 |
|
|
|
|
|
|
PHMSA |
Notice |
Information Collection Activities: LNG and OQ |
Part 193 (LNG), Parts 192, 193, 195 (OQ) |
|
|
|
|
|
|
Jan 12 |
ViaData |
Update |
WinDOT Subscribers: Updated code parts as described in the January 5 Final Rule, Amdt. Nos. 192-119; 193-25; 195-99; 198-6; 199-26 Added GPTC Guide Addendum 7. |
Parts 192, 193, 195, 198, 199 |
|
|
|
|
|
PHMSA |
FR |
Pipeline Safety: Periodic Updates of Regulatory References to Technical Standards and Miscellaneous Amendments |
Parts 192, 193, 195, 198, 199 |
Date |
Agency |
Type |
Description |
Parts Affected |
|
|
|
|
|
PHMSA |
Guidance |
PHMSA document: Guidance for Pipeline Flow Reversals, Product Changes and Conversion to Service. See link in ADB-2014-04. |
Parts 192, 195 |
|
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: National Pipeline Mapping System Public Meeting |
Parts 192, 195 |
|
|
|
|
|
|
Oct 18 |
ViaData |
Updates |
Updates to WinDOT for subscribers. Added interpretations, notices, general information. See updates link on home page for each code part. |
Parts 40, 190, 191, 192, 193, 194, 195, 199, Central Region |
|
|
|
|
|
PHMSA |
ADB |
Pipeline Safety: Guidance for Strengthening Pipeline Safety Through Rigorous Program Evaluation and Meaningful Metrics |
Parts 192, 195 |
|
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: Request for Revision of a Previously Approved Information Collection: National Pipeline Mapping System Program |
Parts 192, 195. |
|
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities, Public Awareness Program. |
Parts 192, 195. |
|
|
|
|
|
|
PHMSA |
ADB |
ADB-2014-04, Guidance for Pipeline Flow Reversals, Product Changes and Conversion to Service. |
Parts 191, 192, 194, 195 |
|
|
|
|
|
|
PHMSA |
Notice |
Meeting of the Technical Pipeline Safety Standards Committee and the Technical Hazardous Liquid Pipeline Safety Standards Committee |
All |
|
|
|
|
|
|
PHMSA |
ADB |
Advisory Bulletin (ADB-2014-03) Clarification regarding the notification(s) required prior to certain construction-related events. |
Parts 191, 195 |
|
|
|
|
|
|
PHMSA |
Notice |
Request for Revision of a Previously Approved Information Collection--National Pipeline Mapping System Program (OMB Control No. 2137-0596). |
Parts 191, 192, 193, 195 |
|
|
|
|
|
|
Jul 01 |
ViaData |
Updates |
Updates for WinDOT subscribers, federal regulations. Added Addenda 5 and 6 to GPTC Guide in Part 192. |
Coast Guard, Notices, Parts 191, 192, 195. |
|
|
|
|
|
PHMSA |
Notice |
Information Collection Activities, Revisions to Operator Identification (OPID) Assignment Request and Operator Registry Notification |
Part 191, 193, 195 |
|
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: Information Collection Activities, Pipeline Safety: Public Awareness Program. |
Parts 192, 193, 195. |
|
|
|
|
|
|
PHMSA |
Notice |
Pipeline Safety: Public Workshop on Pipeline Safety Management Systems |
All operators |
|
|
|
|
|
|
PHMSA |
ADB |
Advisory Bulletin (ADB-2014-02)
Pipeline Safety: Lessons Learned From the Release at Marshall, Michigan |
Parts 192, 195. |
|
|
|
|
|
|
PHMSA |
Notice |
Information Collection Activities, Revisions to Operator Identification (OPID) Assignment Request and Operator Registry Notification |
Parts 191, 193, 195 |
|
|
|
|
|
|